Pushpa 2 Hindi Box Office: Will Runtime Impact Records?

0
47
Pushpa 2 Hindi Box Office: Will Runtime Impact Records?


Pushpa 2 Hindi Box Office: Will Runtime Impact Records?

By this time next week, we will be analyzing the first-day collections of Pushpa 2 and discussing the records it has shattered.

Pushpa 2 has the potential to achieve an all-time record opening across India. For the first time in a while, a film has organically built hype on a pan-India scale.

Also Read – Ashok Galla: Young but Judgment’s None

However, some trade analysts feel that the film’s hype hasn’t reached the level initially expected. The trailer and songs haven’t made as significant an impact as anticipated.

The excitement for the film remains strong thanks to the Pushpa brand, the sequel factor, and Allu Arjun’s star power. But beyond that, there hasn’t been much to significantly amplify the buzz.

Also Read – Biggest Disaster on OTT: Most Trolled Scene

On top of it, it has now been officially announced that the film has a runtime of over 3 hours and 20 minutes. Such a lengthy runtime might put off a section of the audience.

Some people have backed out and said that they will watch the film if word of mouth is good; otherwise, watching a film that is 200 minutes long might be very exhausting.

Also Read – Controversial Producer Thrown Out Of Pushpa 2

Also, many single screens will face difficulty in screening more than 4 shows due to the lengthy duration of the film.

While initially, it was expected that the film would easily cross the first-day collections of Jawan and Pathaan in Hindi, now the expectations have gone down a bit.

The trade now believes that anything above 50 crores net in Hindi would be an outstanding opening for Pushpa 2.

For Allu Arjun, crossing the 50-crore mark without the support of major brand names like Rajamouli, Sandeep Reddy Vanga, or Prashanth Neel in the North would be a phenomenal achievement.

This success would be entirely driven by Allu Arjun’s immense popularity across the country.



Source link